This project is the Phase-2 expansion of the production capacity of TOYO TYRE MALAYSIA with over 100,000 m² floor expansion and renovation. The opening ceremony was attended by the Malaysian government’s Deputy Minister of International Trade and Industry, Dr Ong Kian Ming and the Japanese Consul-General in Malaysia, as well as other guests and local officials.
Plus PM involved in the project from the final selection stage of the tenderer. Plus PM was also appointed to manage the construction stage for the on-site management on costs, check VO, schedules, quality, and safety management. The construction period was initially delayed due to geological improvement on soft ground and heavy rainfall. Concurrently, we held discussions with the contractor to recover the construction period and deliver the project as planned.
当社建設コンサルタントによる
初期ヒアリングは無料です。
まずはお客様のご要望を
おうかがいいたします。
コンストラクションマネジメント実績30年のプラスPM。建設品質向上とコスト削減で、建設プロジェクトを成功に導くコンストラクションマネジメントの会社です。
マレーシア本社
(クアラルンプール)
16-16, Level 16, Wisma UOA II,
Jalan Pinang, 50450 Kuala Lumpur, Malaysia
ジョホール オフィス
Suite 18-01, Level 18
Menara JLand JB City Center
Jalan Tun Abdul Razak
80000 Johor Bahru, Johor
ペナン オフィス
3-3(2249), Level 3
Lorong Setia Sentral 1
Pusat Perniagaan Setia Sentral
14000 Bukit Mertajam, Penang
ハノイ
Plus PM Vietnam Co., Ltd.
7F, The Imperial Suites
71 Van Phuc, Lieu Giai Ward
Ba Dinh, Hanoi, Vietnam