1月 19, 2015
Delay in the construction occurs not only in Malaysia
but also to most parts of the world.
These may affect the overall schedule including
the delayed opening or operation start date and most of the time requires
unnecessary additional cost from the client.
Here are some of the many causes of delay which needs
to be looked into and considered to avoid wasting
huge amount of money for additional cost:
10 Major Factors that Causes Construction Delay:
1. Improper Planning
2. Inadequate Scheduling
3. Improper Cost Management
4. Poor Site Management
5. Inadequate Contractor Experience
6. Insufficient Client Funds
7. Material Delivery Planning Failure
8. Insufficient Labor
9. Equipment Unavailability and Failure
10. Lack of Coordination
Knowing the above mentioned major causes of delay
and for over 28 years of experience in the Construction Management
and Project Management industry with about 300 completed projects.
Plus PM Consultant Sdn. Bhd. a Malaysia based Japanese Project Management
and Construction Management Company provides each client an effective approach
to resolve the issues arising from the construction of any building.
From the conceptual up to the completion stage Plus PM Consultant Sdn. Bhd.
will control the cost,
schedule and quality of the construction on behalf of the client.
Giving the client a peace of mind and delivering the best possible
output of his/her investment.
Plus PM Consultant Sdn. Bhd.
Malaysia Based Japanese Project Management and Construction Management Company
関連記事
ほかのBlogを見る
コンストラクションマネジメント実績30年のプラスPM。建設品質向上とコスト削減で、建設プロジェクトを成功に導くコンストラクションマネジメントの会社です。
マレーシア本社
(クアラルンプール)
16-16, Level 16, Wisma UOA II,
Jalan Pinang, 50450 Kuala Lumpur, Malaysia
ジョホール オフィス
Suite 18-01, Level 18
Menara JLand JB City Center
Jalan Tun Abdul Razak
80000 Johor Bahru, Johor
ペナン オフィス
3-3(2249), Level 3
Lorong Setia Sentral 1
Pusat Perniagaan Setia Sentral
14000 Bukit Mertajam, Penang
ハノイ
Plus PM Vietnam Co., Ltd.
7F, The Imperial Suites
71 Van Phuc, Lieu Giai Ward
Ba Dinh, Hanoi, Vietnam